Yellow PVC pipes lie on dirt at a construction site with a blurred excavator in the background, ready for installation.

Supporting Safe Digging Week 2026

August 15, 2026
 / 
Carney suction excavation machine with extended hose and operator on-site.

This National Safe Digging Week (Monday 7th – Sunday 13th July), we’re reaffirming our support for LSBUD (LinesearchbeforeUdig) and the industry’s ongoing effort to reduce avoidable utility strikes.

With around 60,000 accidental utility strikes occurring in the UK every year, at an estimated cost of £2.4 billion, safe digging practice remains one of the most important — and most preventable — safety priorities on any site.

Find out more about how safety shapes everything we do, from the equipment we choose to the training our operators carry, on our Safety page.


Hire our specialist equipment today



"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*